Process types
- Project process
- One-of-a-kind output, high customization, low volume — a custom build-out.
- Job shop / intermittent
- Many different low-volume jobs through general-purpose equipment — a machine shop or a print shop.
- Batch process
- Moderate volume, moderate variety, produced in groups — a bakery.
- Repetitive / assembly line
- High volume, standardized output, specialized equipment.
- Continuous flow
- Very high volume, commodity output, running around the clock.
As volume rises and variety falls, the sensible process moves down this list, and so does unit cost. Mismatch — high variety on a line, or a job shop making a commodity — is a common and expensive error.
Layout
- Process (functional) layout: like equipment grouped together; flexible, but longer travel and more work-in-process.
- Product (line) layout: equipment arranged in the sequence of operations; efficient, but inflexible and vulnerable to the slowest station.
- Cellular layout: small groups of dissimilar machines dedicated to a family of similar products.
- Fixed-position layout: the product stays put and resources come to it — construction, shipbuilding.
- Retail and warehouse layouts: arranged for exposure and picking efficiency rather than fabrication flow.
Capacity and its measures
- Design capacity
- The maximum output achievable under ideal conditions.
- Effective capacity
- The output achievable given the real product mix, scheduling, maintenance, breaks, and quality standards.
- Actual output
- What was in fact produced in the period.
- Bottleneck
- The resource with the least capacity in the chain; it sets the capacity of the whole process.
Formula
Utilization = Actual output ÷ Design capacityEfficiency = Actual output ÷ Effective capacityExpected output = Effective capacity × EfficiencyWorked example
Worked example: utilization and efficiency
A shop has a design capacity of 1,200 units per week and an effective capacity of 1,000 units. Last week it produced 900 units.
Formula
Utilization = 900 ÷ 1,200 = 75%Efficiency = 900 ÷ 1,000 = 90%Efficiency is high, so the crew is running the process well. The gap between design and effective capacity — not the crew — is where the missing 300 units live.
Planning horizons
| Horizon | Typical span | Decisions |
|---|---|---|
| Long range | Over a year | Facilities, major equipment, new locations |
| Intermediate range | 3 to 18 months | Hiring, subcontracting, tooling, inventory build |
| Short range | Days to weeks | Scheduling, overtime, job sequencing, shift changes |
Capacity strategies
- Lead strategy
- Add capacity before demand arrives. Protects service level and market share; risks paying for idle capacity.
- Lag strategy
- Add capacity only after demand is proven. Protects cash; risks stockouts, long waits, and lost customers.
- Average / incremental strategy
- Add capacity in small steps that track demand, alternating slight surplus and slight shortage.
Economies of scale reduce unit cost as volume grows, up to a point; beyond it, congestion, complexity, and coordination cost create diseconomies of scale.
Lean operations
Lean operations aim to deliver exactly what the customer values with the least waste. Waste is anything the customer would not pay for.
- Overproduction — making more or sooner than needed.
- Waiting — idle people, material, or equipment.
- Unnecessary transportation of material.
- Over-processing — more steps or precision than the customer requires.
- Excess inventory hiding problems and consuming cash.
- Unnecessary motion by workers.
- Defects, rework, and scrap.
- Just-in-time: material arrives as it is needed, exposing problems instead of buffering them.
- Pull scheduling: downstream demand signals upstream production.
- 5S and standard work: an organized, documented, repeatable workplace.
- Continuous improvement (kaizen): small, constant, employee-driven change.